Product scope and market dates
Machine description, intended use, product status, destination market and first EU market-placement date, using the information supplied for the review.
Machinery Regulation readiness
Already hold technical files prepared under the Machinery Directive? We review the documentation against the requirements relevant to your machinery and intended EU market activity, identify gaps and help you plan the next steps before Regulation (EU) 2023/1230 applies on 20 January 2027.
Discuss a technical-file reviewRegulation (EU) 2023/1230 replaces Machinery Directive 2006/42/EC for EU machinery compliance from 20 January 2027. The Regulation introduces a revised legal framework and its own requirements for technical documentation. A file that supported a previous conformity assessment is a useful starting point, but should be checked against the rules applicable to the products and market placements you are planning.
Safemach can review existing technical documentation for manufacturers, importers and machinery integrators. We agree the product scope, intended use, destination market and relevant dates first, then check the available evidence against the agreed review criteria.
This is a focused documentation review, not a presumption that every existing machine needs a complete reassessment. The Regulation has transitional provisions for products placed on the market in conformity with the Machinery Directive before 20 January 2027. The position must be considered for each product and its circumstances.
If you also supply Great Britain, its machinery requirements and designated standards need separate consideration. An EU Regulation review should not be treated as confirmation that the GB route is covered.
To scope the review, share the machine or product-family description, its intended use and EU market plans, plus the date it was or is expected to be first placed on the market.
Useful documents include the existing technical file, risk assessment, drawings, instructions, declarations, standards list and test or validation records. We can agree a review of one file, a product family or a sample.
Request a scoping callThe review is tailored to the machine and the documents available. Depending on scope, it can examine:
Machine description, intended use, product status, destination market and first EU market-placement date, using the information supplied for the review.
The risk assessment and evidence against applicable essential health and safety requirements in Annex III, including protective measures and recorded residual risks.
Drawings, circuit information, calculations, test reports and explanations, plus the documented production means and internal measures for series conformity where applicable.
Line-by-line check of standards references, their application and the conformity route, including items that may need further assessment.
Where applicable, review safety-function specifications and validation evidence, and flag the Regulation’s technical-file item for safety-related software source code or programming logic, which is subject to a reasoned request from a competent authority.
Where safety-related operations are controlled by sensor data, check whether the file describes relevant sensor-fed, remotely driven or autonomous system characteristics, capabilities, limitations and development, testing and validation processes.
For each agreed technical file, the review can return a red, amber or green status against each applicable Annex IV item (Part A or Part B, as relevant), with the specific missing or incomplete evidence recorded against it.
The report can also recommend an owner role and provide an indicative effort estimate for each action. We can order files by their first EU market-placement date, using the dates you provide, so your team can prioritise its review plan.
We can arrange a Teams review of one file to walk through the findings, clarify actions and discuss practical next steps. If you need support beyond the review, our engineers can discuss risk assessment, safety-system design and validation, stop-time testing or other machinery safety work that fits the project. Any follow-on work is agreed separately.
A gap analysis does not itself establish conformity or replace the manufacturer’s assessment and legal responsibilities. Where the review raises a product-specific legal question or conformity route decision, we can identify it for appropriate specialist consideration.
A Teams review of one technical file can help your team understand the findings, discuss priorities and clarify what to do next. We will agree the file and review scope in advance.
Arrange a Teams reviewThis page provides general information, not legal advice or a conformity assessment of a specific machine. The applicable requirements depend on the product, role, market and date of placement.
Regulation (EU) 2023/1230 applies from 20 January 2027. A review can help manufacturers prepare technical documentation for machinery they intend to place on the EU market or put into service under the new framework.
Not automatically. The Regulation includes transitional provisions for products placed on the market in conformity with Directive 2006/42/EC before 20 January 2027. The position depends on when each product is placed on the market, its conformity status and any changes made; an existing CE mark on a product family does not by itself answer every case.
The applicable EU and Great Britain requirements are distinct and should be considered separately. Safemach can agree a review scope that identifies the destination markets and the relevant technical documentation and standards routes for each.
The agreed review can provide a structured record of the documents reviewed, identified gaps, relevant evidence to locate or update, and prioritised recommendations for next steps. The scope and format are confirmed for each project.
No. It is a review of available documentation against an agreed scope. It does not replace the manufacturer’s conformity assessment, technical evidence, legal responsibilities or any required third-party assessment.