LEV Testing: What COSHH Requires and When a System Has Failed

LEV Testing: What COSHH Requires and When a System Has Failed

Safety engineer inspecting an industrial local exhaust ventilation system in a factory

Local exhaust ventilation (LEV) is among the most commonly under-maintained forms of safety equipment on a factory floor. A test report marked “pass” is not, by itself, proof that the system is protecting people: the result needs to be based on a proper examination and judged against the system’s design and commissioning performance.

The Control of Substances Hazardous to Health Regulations 2002 (COSHH) set the legal duty. The Health and Safety Executive’s guidance, Controlling airborne contaminants at work: A guide to local exhaust ventilation (LEV) (HSG258), explains how to examine and test a system effectively.

What does COSHH require?

Under COSHH 2002, Regulation 9, employers must ensure that control measures, including LEV, are maintained in an efficient state, in efficient working order, in good repair and in a clean condition. LEV plant must also be thoroughly examined and tested at least every 14 months, unless a shorter interval applies to the process.

The 14-month period is a maximum, not a recommendation for every system. Some processes listed in Schedule 4 to COSHH have shorter statutory intervals. A risk assessment may also show that more frequent testing is appropriate, for example, if the system or its filters deteriorate quickly, or the consequences of poor control are serious.

HSG258 describes what a thorough examination and test involves. It is more than taking an air-velocity reading at a hood. A competent person needs to examine the system, assess its technical performance and consider whether it is effectively controlling exposure during the process.

What should an LEV examination and test cover?

A thorough examination should assess the whole extraction system, from the point where the contaminant is generated to the system’s discharge. Depending on the system and process, this can include:

  • Hoods and capture: are they correctly positioned, undamaged and capable of capturing the contaminant at source?
  • Ductwork: is it intact and suitably configured, with no blockages, leaks or unplanned branches?
  • Airflow and pressure: are measurements such as hood face velocity, duct transport velocity, volume flow and static pressure consistent with the system’s design?
  • Filters and air cleaners: are the filter media and cleaning arrangements in suitable condition? Are relevant indicators and alarms working?
  • Fans and drives: are the fan, motor, belts and drive operating correctly?
  • Discharge and recirculation: is extracted air discharged safely, and is there a risk that contaminants are returning to the workplace?
  • Control effectiveness: does the LEV control exposure in practice, with the process operating and workers using the system correctly?

The appropriate technical performance indicators depend on the system type. A hood’s face velocity may be relevant in one design, while pressure readings, volume flow or duct velocity may be central in another. A single reading should not be treated as a universal pass/fail figure.

Engineer measuring airflow at an industrial extraction hood

Why do commissioning figures matter?

A test result only makes sense when it can be compared with an appropriate benchmark. The commissioning report should record how the system was designed to perform, including relevant measurements and the locations where they were taken.

For example, a duct reading of 8 metres per second cannot be judged in isolation. If the corresponding commissioned figure was 12 metres per second, the difference may indicate a problem that needs investigation. If the design information is missing, it becomes harder to determine whether the current performance is adequate.

HSG258 expects examination results to be considered against the commissioning information, or equivalent performance data. A useful report should identify the system examined, explain the measurements and observations, and clearly set out any deficiencies and recommended remedial action. It should not simply record figures without explaining what they mean.

What should the LEV logbook and report contain?

Keep a logbook for each system so that the people responsible for it can understand its design, use and history. It should include, where available:

  • a system identification and description of the process and substances controlled;
  • a schematic of the system, including hoods, branches, test points and key components;
  • the commissioning report and original performance figures;
  • user instructions and routine inspection or maintenance requirements;
  • examination and test reports, repairs, filter changes and modifications;
  • defects identified and records of the action taken.

COSHH Regulation 9 requires a suitable record of examinations, tests and repairs to be kept available for at least five years. Retaining the system’s wider performance and maintenance information also helps future examiners identify deterioration and assess changes.

How can you tell when an LEV system may have failed?

A system can look intact and still perform poorly. Look for changes in operation and signs that contaminants are escaping or not being captured. Warning signs include:

  • measured capture or airflow performance below the relevant design or commissioning figures;
  • visible dust settling around a process where surfaces should remain clear;
  • condensation, deposits or blockages in hoods or ducts;
  • split, crushed or damaged flexible ducting;
  • filters that are blocked, overloaded or not being cleaned effectively;
  • a worn fan, slipping belt, unusual noise or a change in fan performance;
  • extracted air that could be recirculating back into the workplace;
  • an LEV system routinely switched off because it is noisy or inconvenient;
  • hoods that have been moved, damaged or left too far from the source.

These signs do not all prove that a system has failed, but they should prompt investigation. Do not wait for the next scheduled test if you suspect the system is no longer controlling exposure.

Engineer checking a dust extraction hood and flexible ducting in a factory

Common gaps we see in inherited systems

A frequent issue is a system that has been extended with extra branches since it was commissioned. Adding new extraction points can change the airflow available across the network. Without proper design review and rebalancing, one hood may receive less flow than intended even if the fan is still running.

Another gap is a report that identifies problems but is not followed by action. A test is useful only if findings are understood, prioritised and resolved. We also encounter incomplete logbooks, missing commissioning data and testing arranged without checking whether the examiner has the competence and information needed to assess the system properly.

If you have inherited a system with no commissioning figures or logbook, do not assume that a current reading proves it is adequate. Establish what process and substances it controls, identify available design information, assess its condition and determine what measurements are needed to verify performance.

How often should LEV be tested, and when should it be reassessed?

The statutory maximum is generally 14 months, subject to shorter intervals for certain Schedule 4 processes. Follow any shorter interval set by the relevant process requirements or justified by the risk assessment.

Arrange a review before the next routine examination if there has been a significant change, including:

  • a modification or extension to the ductwork or extraction points;
  • a new process or a change in how the process operates;
  • a change in the substance, form or amount of contaminant;
  • a change to the layout that affects airflow or the position of workers and equipment.

After a change, determine whether the system needs redesign, rebalancing, recommissioning or a new assessment of control effectiveness. Routine testing at the statutory interval does not remove the need to check that the system remains suitable for the process it serves.

What about combustible dust and DSEAR?

Where extracted dust is combustible, the extraction system is relevant not only to exposure control but also to fire and explosion risk. The system and the way dust is collected, conveyed and discharged should therefore be considered as part of the site’s assessment under the Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR). A COSHH-focused LEV test does not, on its own, amount to a complete DSEAR assessment.

Engineer reviewing an industrial extraction fan and ductwork

What should you do next?

Check that each system has a current examination and test, a usable logbook, and commissioning information that lets you interpret the results. Make sure the findings are assigned to someone for action, and review the system promptly after changes to the process, substance or layout.

Safemach carries out LEV thorough examination and testing in line with COSHH and HSG258. We can also consider extraction within wider site safety work, including PUWER inspections. To discuss an inherited system, missing records or a report that needs follow-up, contact Safemach to speak with our team.